Cromwell (GRE) - Riverton 115kV (J3752)

Cromwell (GRE) - Riverton 115kV is a 220.0 MW solar interconnection project in Aitkin, Minnesota with a current status of withdrawn. It is proposed to connect at Cromwell (GRE) - Riverton 115kV.

220.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameCromwell (GRE) - Riverton 115kV
Queue IDJ3752
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity220.0 MW
StateMinnesota
CountyAitkin
Point of interconnectionCromwell (GRE) - Riverton 115kV
Requested (queue) date2024-04-18
Proposed in-service date2028-10-01
Operational date2028-10-01
Withdrawn date2025-12-23
Developer
Utility / transmission ownerMINNESOTA POWER INC.

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata