Crooked Lake Storage (0963)

Crooked Lake Storage is a 7.0 MW battery interconnection project in Yorktown, New York with a current status of withdrawn. It is proposed to connect at Mohansic 13.2kV Substation.

7.0 MWCapacity
WithdrawnStatus
HMarket
BatteryTechnology

Project facts

Canonical nameCrooked Lake Storage
Queue ID0963
Statuswithdrawn
Source status0
MarketH
TechnologyBattery
Capacity7.0 MW
StateNew York
CountyYorktown
Point of interconnectionMohansic 13.2kV Substation
Requested (queue) date2019-12-19
Proposed in-service date2020-04-30
Operational date
Withdrawn date
DeveloperInvenergy
Utility / transmission ownerNYSEG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata