Cross Cedar Solar (GI-217)
Cross Cedar Solar is a 200.0 MW solar+battery interconnection project in Decatur County, Georgia with a current status of active. It is proposed to connect at North Dublin - Wadley 230 kV TL.
200.0 MWCapacity
ActiveStatus
GAMarket
Solar+BatteryTechnology
Project facts
| Canonical name | Cross Cedar Solar |
|---|---|
| Queue ID | GI-217 |
| Status | active |
| Source status | SIS Report Issued |
| Market | GA |
| Technology | Solar+Battery |
| Capacity | 200.0 MW |
| State | Georgia |
| County | Decatur County |
| Point of interconnection | North Dublin - Wadley 230 kV TL |
| Requested (queue) date | 2025-10-20 |
| Proposed in-service date | 2029-03-27 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Georgia Transmission |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: gtc-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata