Cross County Energy Storage (C24-132)

Cross County Energy Storage is a 130.0 MW battery interconnection project in Westchester, New York with a current status of withdrawn. It is proposed to connect at Eastview to Buchanan, 345 kV.

130.0 MWCapacity
WithdrawnStatus
NYISOMarket
BatteryTechnology

Project facts

Canonical nameCross County Energy Storage
Queue IDC24-132
Statuswithdrawn
Source statuswithdrawn
MarketNYISO
TechnologyBattery
Capacity130.0 MW
StateNew York
CountyWestchester
Point of interconnectionEastview to Buchanan, 345 kV
Requested (queue) date2024-09-06
Proposed in-service date
Operational date
Withdrawn date
DeveloperHW Power, LLC
Utility / transmission ownerCONED

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.