Crossroads 115 (24-03011)

Crossroads 115 is a 130.0 MW battery interconnection project in Loveland, Colorado with a current status of active. It is proposed to connect at Crossroads 115.

130.0 MWCapacity
ActiveStatus
COMarket
BatteryTechnology

Project facts

Canonical nameCrossroads 115
Queue ID24-03011
Statusactive
Source statusIA PENDING
MarketCO
TechnologyBattery
Capacity130.0 MW
StateColorado
CountyLoveland
Point of interconnectionCrossroads 115
Requested (queue) date2024-03-01
Proposed in-service date2028-01-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerPRPA

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.