Crossroads - Hobbs 345 kV Substation (GEN-2024-073)

Crossroads - Hobbs 345 kV Substation is a 500.0 MW solar interconnection project in Lea, New Mexico with a current status of withdrawn. It is proposed to connect at Crossroads - Hobbs 345 kV Substation.

500.0 MWCapacity
WithdrawnStatus
NMMarket
SolarTechnology

Project facts

Canonical nameCrossroads - Hobbs 345 kV Substation
Queue IDGEN-2024-073
Statuswithdrawn
Source statusWITHDRAWN
MarketNM
TechnologySolar
Capacity500.0 MW
StateNew Mexico
CountyLea
Point of interconnectionCrossroads - Hobbs 345 kV Substation
Requested (queue) date2024-10-30
Proposed in-service date2028-12-01
Operational date
Withdrawn date2026-05-21
Developer
Utility / transmission ownerNEETSW

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata