Crossville West Substation 138kV Bus - Albion South - Norris City 138 kV Line is a 250.0 MW solar interconnection project in White County, Illinois with a current status of operational. It is proposed to connect at Crossville West Substation 138kV Bus - Albion South - Norris City 138 kV Line.
Project facts
| Canonical name | Crossville West Substation 138kV Bus - Albion South - Norris City 138 kV Line |
|---|---|
| Queue ID | J800 |
| Status | operational |
| Source status | Done |
| Market | — |
| Technology | Solar |
| Capacity | 250.0 MW |
| State | Illinois |
| County | White County |
| Point of interconnection | Crossville West Substation 138kV Bus - Albion South - Norris City 138 kV Line |
| Requested (queue) date | 2017-06-16 |
| Proposed in-service date | 2020-09-30 |
| Operational date | 2020-09-30 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | AMEREN ILLINOIS |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | operational | high |
Explore related data
Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata