Crowned Heron BESS 2 (24INR0493)

Crowned Heron BESS 2 is a 154.2 MW other interconnection project in Fort Bend, Texas with a current status of operational. It is proposed to connect at WA Parish 345 kV Bus #44000.

154.2 MWCapacity
OperationalStatus
Fort BendMarket
OtherTechnology

Project facts

Canonical nameCrowned Heron BESS 2
Queue ID24INR0493
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketFort Bend
TechnologyOther
Capacity154.2 MW
StateTexas
CountyFort Bend
Point of interconnectionWA Parish 345 kV Bus #44000
Requested (queue) date2022-11-23
Proposed in-service date
Operational date2026-07-20
Withdrawn date
DeveloperRWE Solar Development, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.