Crystal River (628_ST4)

Crystal River is a 739.2 MW other interconnection project in Citrus, Florida with a current status of operational.

739.2 MWCapacity
OperationalStatus
FPCMarket
OtherTechnology

Project facts

Canonical nameCrystal River
Queue ID628_ST4
Statusoperational
Source status(OP) Operating
MarketFPC
TechnologyOther
Capacity739.2 MW
StateFlorida
CountyCitrus
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date1982-12-01
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata