CSL Gas Recovery (50572_GEN1)

CSL Gas Recovery is a 3.0 MW gas interconnection project in Broward, Florida with a current status of operational.

3.0 MWCapacity
OperationalStatus
FPLMarket
GasTechnology

Project facts

Canonical nameCSL Gas Recovery
Queue ID50572_GEN1
Statusoperational
Source status(OP) Operating
MarketFPL
TechnologyGas
Capacity3.0 MW
StateFlorida
CountyBroward
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date1989-03-01
Withdrawn date—
Developer—
Utility / transmission ownerWM Renewable Energy LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-11

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata