CSUF Nutwood Solar (60979_PV1)

CSUF Nutwood Solar is a 1.9 MW solar interconnection project in Orange, California with a current status of operational.

1.9 MWCapacity
OperationalStatus
CISOMarket
SolarTechnology

Project facts

Canonical nameCSUF Nutwood Solar
Queue ID60979_PV1
Statusoperational
Source status(OP) Operating
MarketCISO
TechnologySolar
Capacity1.9 MW
StateCalifornia
CountyOrange
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2016-12-01
Withdrawn date
Developer
Utility / transmission ownerMN8 Energy LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata