CTEC Solar 186 Foster St, South Windsor (1203)
CTEC Solar 186 Foster St, South Windsor is a 1.9 MW solar interconnection project in Hartford, Connecticut with a current status of withdrawn. It is proposed to connect at Barbour Hill 23J.
1.9 MWCapacity
WithdrawnStatus
CTMarket
SolarTechnology
Project facts
| Canonical name | CTEC Solar 186 Foster St, South Windsor |
|---|---|
| Queue ID | 1203 |
| Status | withdrawn |
| Source status | W |
| Market | CT |
| Technology | Solar |
| Capacity | 1.9 MW |
| State | Connecticut |
| County | Hartford |
| Point of interconnection | Barbour Hill 23J |
| Requested (queue) date | 2021-12-28 |
| Proposed in-service date | 2023-07-01 |
| Operational date | — |
| Withdrawn date | 2025-06-13 |
| Developer | — |
| Utility / transmission owner | ISO-NE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata