Cuchillas BESS (27INR0077)

Cuchillas BESS is a 306.9 MW other interconnection project in Webb, Texas with a current status of operational. It is proposed to connect at 80219 Lobo 345kV.

306.9 MWCapacity
OperationalStatus
WebbMarket
OtherTechnology

Project facts

Canonical nameCuchillas BESS
Queue ID27INR0077
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketWebb
TechnologyOther
Capacity306.9 MW
StateTexas
CountyWebb
Point of interconnection80219 Lobo 345kV
Requested (queue) date2023-09-26
Proposed in-service date
Operational date2028-12-15
Withdrawn date
DeveloperGransolar Texas Twenty Two
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata