Cuero BESS is a 10.0 MW battery interconnection project with a current status of active. It is proposed to connect at 500 kVA, 12.47Y/7.2-0.48Y/0.277kV, 3PH, 60Hz, Z=5.75%, Liquid Filled Type, Type 3R Outdoor_x000D_ • Station Name: CUERO LCRA_x000D_ • Station Code: CUERO_x000D_ • BUS #: 7244_x000D_ • Transmission Level Voltage: 138 kV_x000D_ • Load/Load Transformer: Cuero T4_x000D_ .
Project facts
| Canonical name | Cuero BESS |
|---|---|
| Queue ID | 25INR0675 |
| Status | active |
| Source status | active |
| Market | ERCOT |
| Technology | Battery |
| Capacity | 10.0 MW |
| State | — |
| County | — |
| Point of interconnection | 500 kVA, 12.47Y/7.2-0.48Y/0.277kV, 3PH, 60Hz, Z=5.75%, Liquid Filled Type, Type 3R Outdoor_x000D_ • Station Name: CUERO LCRA_x000D_ • Station Code: CUERO_x000D_ • BUS #: 7244_x000D_ • Transmission Level Voltage: 138 kV_x000D_ • Load/Load Transformer: Cuero T4_x000D_ |
| Requested (queue) date | 2024-05-22 |
| Proposed in-service date | 2026-05-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | CUERO BESS, LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata