Cuomo Hydro 2 (1025)

Cuomo Hydro 2 is a 300.0 MW battery interconnection project in Westchester, New York with a current status of withdrawn. It is proposed to connect at Dunwoodie 345kV Substation.

300.0 MWCapacity
WithdrawnStatus
IMarket
BatteryTechnology

Project facts

Canonical nameCuomo Hydro 2
Queue ID1025
Statuswithdrawn
Source status0
MarketI
TechnologyBattery
Capacity300.0 MW
StateNew York
CountyWestchester
Point of interconnectionDunwoodie 345kV Substation
Requested (queue) date2020-06-03
Proposed in-service date2021-03-31
Operational date
Withdrawn date
DeveloperRenewable Energy Concepts, Inc.
Utility / transmission ownerCONED

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.