Custer to Rosebud Creek 230 kV Line Tap (GEN-2023-074)

Custer to Rosebud Creek 230 kV Line Tap is a 85.0 MW solar interconnection project in Rosebud, Montana with a current status of withdrawn. It is proposed to connect at Custer to Rosebud Creek 230 kV Line Tap.

85.0 MWCapacity
WithdrawnStatus
MTMarket
SolarTechnology

Project facts

Canonical nameCuster to Rosebud Creek 230 kV Line Tap
Queue IDGEN-2023-074
Statuswithdrawn
Source statusWITHDRAWN
MarketMT
TechnologySolar
Capacity85.0 MW
StateMontana
CountyRosebud
Point of interconnectionCuster to Rosebud Creek 230 kV Line Tap
Requested (queue) date2023-10-02
Proposed in-service date2028-08-31
Operational date
Withdrawn date2024-04-17
Developer
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata