Cutler Hydro (3646_2)

Cutler Hydro is a 15.0 MW other interconnection project in Box Elder, Utah with a current status of operational.

15.0 MWCapacity
OperationalStatus
PACEMarket
OtherTechnology

Project facts

Canonical nameCutler Hydro
Queue ID3646_2
Statusoperational
Source status(OP) Operating
MarketPACE
TechnologyOther
Capacity15.0 MW
StateUtah
CountyBox Elder
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date1927-07-01
Withdrawn date—
Developer—
Utility / transmission ownerPacifiCorp

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata