Cuyahoga Falls 1 (62658_P002)

Cuyahoga Falls 1 is a 1.5 MW other interconnection project in Summit, Ohio with a current status of operational.

1.5 MWCapacity
OperationalStatus
PJMMarket
OtherTechnology

Project facts

Canonical nameCuyahoga Falls 1
Queue ID62658_P002
Statusoperational
Source status(OP) Operating
MarketPJM
TechnologyOther
Capacity1.5 MW
StateOhio
CountySummit
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2018-07-01
Withdrawn date
Developer
Utility / transmission ownerCity of Cuyahoga Falls - (OH)

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.