Dadeville East - Bolivar South 161kV (GEN-2022-079)

Dadeville East - Bolivar South 161kV is a 192.0 MW solar interconnection project in Cedar, Missouri with a current status of withdrawn. It is proposed to connect at Dadeville East - Bolivar South 161kV.

192.0 MWCapacity
WithdrawnStatus
MOMarket
SolarTechnology

Project facts

Canonical nameDadeville East - Bolivar South 161kV
Queue IDGEN-2022-079
Statuswithdrawn
Source statusWITHDRAWN
MarketMO
TechnologySolar
Capacity192.0 MW
StateMissouri
CountyCedar
Point of interconnectionDadeville East - Bolivar South 161kV
Requested (queue) date2022-09-22
Proposed in-service date2027-10-31
Operational date
Withdrawn date2025-03-06
Developer
Utility / transmission ownerEDE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.