Cedar County, Missouri — Interconnection Projects

The interXdata warehouse tracks 4 interconnection projects in Cedar, Missouri, representing 342 MW of requested capacity.

4Total projects
0Active
2Operational
2Withdrawn
342 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar2194 MW
Battery196 MW
Other152 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Dadeville East - Bolivar South 161kVGEN-2022-079Solar192.0 MWwithdrawnCedar, Missouri
Dadeville East - Bolivar South 161kVGEN-2022-080Battery96.0 MWwithdrawnCedar, Missouri
Stockton Hydro2124_1Other52.0 MWoperationalCedar, Missouri
El Dorado Springs Solar Farm61566_EDSF1Solar2.5 MWoperationalCedar, Missouri

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Cedar County.

Start tracking with interXdata