Dalton 2 (59556_1)

Dalton 2 is a 6.5 MW solar interconnection project in Murray, Georgia with a current status of operational.

6.5 MWCapacity
OperationalStatus
SOCOMarket
SolarTechnology

Project facts

Canonical nameDalton 2
Queue ID59556_1
Statusoperational
Source status(OP) Operating
MarketSOCO
TechnologySolar
Capacity6.5 MW
StateGeorgia
CountyMurray
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2014-12-01
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata