DAMAZO (Second Division) SOLAR (20INR0248)

DAMAZO (Second Division) SOLAR is a 100.2 MW solar interconnection project in Brazoria, Texas with a current status of operational. It is proposed to connect at Tap 138 kV SANBER_POI_8 (Bus# 43110) to WEST COLUMBIA (Bus# 43380) Ckt 60 Line.

100.2 MWCapacity
OperationalStatus
BrazoriaMarket
SolarTechnology

Project facts

Canonical nameDAMAZO (Second Division) SOLAR
Queue ID20INR0248
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketBrazoria
TechnologySolar
Capacity100.2 MW
StateTexas
CountyBrazoria
Point of interconnectionTap 138 kV SANBER_POI_8 (Bus# 43110) to WEST COLUMBIA (Bus# 43380) Ckt 60 Line
Requested (queue) date2019-03-28
Proposed in-service date
Operational date2025-12-31
Withdrawn date
DeveloperTX Gulf Solar 1 LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata