Damon BESS 2 (23INR0603)

Damon BESS 2 is a 10.0 MW other interconnection project in Brazoria, Texas with a current status of active. It is proposed to connect at 9.99 MW 50 MWh battery energy storage project connecting at 12.47kV Damon (DA) substation. Station Name (TDSP Station Code): DA Load/Load Transformer Name: TR2 PTI BUS number: 42370 Voltage in kV (Transmission Level): 138 kV .

10.0 MWCapacity
ActiveStatus
BrazoriaMarket
OtherTechnology

Project facts

Canonical nameDamon BESS 2
Queue ID23INR0603
Statusactive
Source status
MarketBrazoria
TechnologyOther
Capacity10.0 MW
StateTexas
CountyBrazoria
Point of interconnection9.99 MW 50 MWh battery energy storage project connecting at 12.47kV Damon (DA) substation. Station Name (TDSP Station Code): DA Load/Load Transformer Name: TR2 PTI BUS number: 42370 Voltage in kV (Transmission Level): 138 kV
Requested (queue) date
Proposed in-service date2027-08-21
Operational date
Withdrawn date
DeveloperPR DAMON, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata