Damon BESS 2 (23INR0603)
Damon BESS 2 is a 10.0 MW other interconnection project in Brazoria, Texas with a current status of active. It is proposed to connect at 9.99 MW 50 MWh battery energy storage project connecting at 12.47kV Damon (DA) substation. Station Name (TDSP Station Code): DA Load/Load Transformer Name: TR2 PTI BUS number: 42370 Voltage in kV (Transmission Level): 138 kV .
Project facts
| Canonical name | Damon BESS 2 |
|---|---|
| Queue ID | 23INR0603 |
| Status | active |
| Source status | — |
| Market | Brazoria |
| Technology | Other |
| Capacity | 10.0 MW |
| State | Texas |
| County | Brazoria |
| Point of interconnection | 9.99 MW 50 MWh battery energy storage project connecting at 12.47kV Damon (DA) substation. Station Name (TDSP Station Code): DA Load/Load Transformer Name: TR2 PTI BUS number: 42370 Voltage in kV (Transmission Level): 138 kV |
| Requested (queue) date | — |
| Proposed in-service date | 2027-08-21 |
| Operational date | — |
| Withdrawn date | — |
| Developer | PR DAMON, LLC |
| Utility / transmission owner | ERCOT |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | active | high |
Explore related data
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.