Danville - Magazine 161kV Line (ERAS-2025-005)
Danville - Magazine 161kV Line is a 150.0 MW solar interconnection project in Yell County, Arkansas with a current status of operational. It is proposed to connect at Danville - Magazine 161kV Line.
150.0 MWCapacity
OperationalStatus
ARMarket
SolarTechnology
Project facts
| Canonical name | Danville - Magazine 161kV Line |
|---|---|
| Queue ID | ERAS-2025-005 |
| Status | operational |
| Source status | ERAS |
| Market | AR |
| Technology | Solar |
| Capacity | 150.0 MW |
| State | Arkansas |
| County | Yell County |
| Point of interconnection | Danville - Magazine 161kV Line |
| Requested (queue) date | 2025-09-10 |
| Proposed in-service date | — |
| Operational date | 2029-03-01 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | AEP |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.