Dart Energy Storage A1 (28INR0293)

Dart Energy Storage A1 is a 50.0 MW battery interconnection project in Taylor, Texas with a current status of suspended.

50.0 MWCapacity
SuspendedStatus
TaylorMarket
BatteryTechnology

Project facts

Canonical nameDart Energy Storage A1
Queue ID28INR0293
Statussuspended
Source status—
MarketTaylor
TechnologyBattery
Capacity50.0 MW
StateTexas
CountyTaylor
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-30developerDart Energy Storage LLC—low
2026-09-30poi_nameTAP138KV #6290 ABILENE MAPLE STREET - #6275 ABILENE EAST—low
2026-09-30phaseSS Completed, FIS Started, No IA—low
2026-09-30operational_date2028-11-30—medium
2026-09-30statusoperationalsuspendedhigh
2026-07-31new_project—operationalhigh

Explore related data

Source last checked2026-10-30
Data last materially changed2026-10-30
Page data generated2026-11-26

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.