Datto-Corning North 161 kV line (J1414)

Datto-Corning North 161 kV line is a 150.0 MW solar interconnection project in Clay County, Arkansas with a current status of withdrawn. It is proposed to connect at Datto-Corning North 161 kV line.

150.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameDatto-Corning North 161 kV line
Queue IDJ1414
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity150.0 MW
StateArkansas
CountyClay County
Point of interconnectionDatto-Corning North 161 kV line
Requested (queue) date2019-04-29
Proposed in-service date2022-10-30
Operational date2022-10-30
Withdrawn date2020-08-04
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.