Davis Besse-Beaver 345kV (X1-027A_AT12)

Davis Besse-Beaver 345kV is a 500.0 MW wind interconnection project in Huron, Ohio with a current status of withdrawn.

500.0 MWCapacity
WithdrawnStatus
—Market
WindTechnology

Project facts

Canonical nameDavis Besse-Beaver 345kV
Queue IDX1-027A_AT12
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyWind
Capacity500.0 MW
StateOhio
CountyHuron
Point of interconnection—
Requested (queue) date2011-03-03
Proposed in-service date2018-04-01
Operational date—
Withdrawn date2018-07-18
Developer—
Utility / transmission ownerATSI

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata