Dawson-Medora (Mingusville) 230kV (GEN-2015-098)

Dawson-Medora (Mingusville) 230kV is a 100.0 MW wind interconnection project in Wibaux, Montana with a current status of withdrawn. It is proposed to connect at Dawson-Medora (Mingusville) 230kV.

100.0 MWCapacity
WithdrawnStatus
MTMarket
WindTechnology

Project facts

Canonical nameDawson-Medora (Mingusville) 230kV
Queue IDGEN-2015-098
Statuswithdrawn
Source statusWITHDRAWN
MarketMT
TechnologyWind
Capacity100.0 MW
StateMontana
CountyWibaux
Point of interconnectionDawson-Medora (Mingusville) 230kV
Requested (queue) date2015-10-23
Proposed in-service date
Operational date
Withdrawn date2019-03-04
Developer
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata