Dawson Solar (AG1-374)

Dawson Solar is a 300.0 MW solar interconnection project in Mclean, Illinois with a current status of active. It is proposed to connect at Blue Mound 345 kV.

300.0 MWCapacity
ActiveStatus
PJMMarket
SolarTechnology

Project facts

Canonical nameDawson Solar
Queue IDAG1-374
Statusactive
Source statusactive
MarketPJM
TechnologySolar
Capacity300.0 MW
StateIllinois
CountyMclean
Point of interconnectionBlue Mound 345 kV
Requested (queue) date2020-09-30
Proposed in-service date2024-12-01
Operational date
Withdrawn date
DeveloperDeriva Energy
Utility / transmission ownerComEd

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata