Deep Creek-Penn Mar 115kV (Y1-003)

Deep Creek-Penn Mar 115kV is a 60.0 MW wind interconnection project in Garrett, Maryland with a current status of withdrawn.

60.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameDeep Creek-Penn Mar 115kV
Queue IDY1-003
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity60.0 MW
StateMaryland
CountyGarrett
Point of interconnection
Requested (queue) date2012-02-07
Proposed in-service date2017-10-31
Operational date
Withdrawn date2017-01-25
Developer
Utility / transmission ownerAPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata