Deer Creek-Fisher Body-Mullin 138kV (U3-002)

Deer Creek-Fisher Body-Mullin 138kV is a 200.0 MW wind interconnection project in Madison, Indiana with a current status of operational.

200.0 MWCapacity
OperationalStatus
—Market
WindTechnology

Project facts

Canonical nameDeer Creek-Fisher Body-Mullin 138kV
Queue IDU3-002
Statusoperational
Source statusIn Service
Market—
TechnologyWind
Capacity200.0 MW
StateIndiana
CountyMadison
Point of interconnection—
Requested (queue) date2008-08-13
Proposed in-service date—
Operational date2012-12-31
Withdrawn date—
Developer—
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—operationalhigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.