Delilah Solar 1 (22INR0202)

Delilah Solar 1 is a 300.0 MW solar interconnection project in Lamar, Texas with a current status of operational. It is proposed to connect at tap both 345kV 1685 FarmersVl - 1695 Moses ckts.

300.0 MWCapacity
OperationalStatus
LamarMarket
SolarTechnology

Project facts

Canonical nameDelilah Solar 1
Queue ID22INR0202
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketLamar
TechnologySolar
Capacity300.0 MW
StateTexas
CountyLamar
Point of interconnectiontap both 345kV 1685 FarmersVl - 1695 Moses ckts
Requested (queue) date2018-11-20
Proposed in-service date
Operational date2026-09-30
Withdrawn date
DeveloperDelilah Solar Energy II LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.