Dellwood Solar (GI-149)

Dellwood Solar is a 150.0 MW solar+battery interconnection project in Emanuel, Georgia with a current status of active. It is proposed to connect at Vidalia-Wadley Primary (white) 230 kV line.

150.0 MWCapacity
ActiveStatus
SoutheastMarket
Solar+BatteryTechnology

Project facts

Canonical nameDellwood Solar
Queue IDGI-149
Statusactive
Source statusactive
MarketSoutheast
TechnologySolar+Battery
Capacity150.0 MW
StateGeorgia
CountyEmanuel
Point of interconnectionVidalia-Wadley Primary (white) 230 kV line
Requested (queue) date2021-05-04
Proposed in-service date2024-02-28
Operational date2023-09-30
Withdrawn date
Developer
Utility / transmission ownerGeorgia Transmission

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata