DELTA SWYD - DREW [MS] 115.0kV (J3629)

DELTA SWYD - DREW [MS] 115.0kV is a 210.0 MW solar interconnection project in Bolivar, Mississippi with a current status of withdrawn. It is proposed to connect at DELTA SWYD - DREW [MS] 115.0kV.

210.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameDELTA SWYD - DREW [MS] 115.0kV
Queue IDJ3629
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity210.0 MW
StateMississippi
CountyBolivar
Point of interconnectionDELTA SWYD - DREW [MS] 115.0kV
Requested (queue) date2024-04-18
Proposed in-service date2027-12-15
Operational date2027-12-15
Withdrawn date2025-09-30
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.