Bolivar County, Mississippi — Interconnection Projects
The interXdata warehouse tracks 8 interconnection projects in Bolivar, Mississippi, representing 1,055 MW of requested capacity.
8Total projects
0Active
3Operational
5Withdrawn
1,055 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 8 | 1,055 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| DELTA SWYD - DREW [MS] 115.0kV | J3629 | Solar | 210.0 MW | withdrawn | Bolivar, Mississippi |
| CLEVELAND/SOUTH | J3541 | Solar | 150.0 MW | withdrawn | Bolivar, Mississippi |
| DELTA SES SWITCHYARD 115kV | J2287 | Solar | 135.0 MW | operational | Bolivar, Mississippi |
| STRINGTOWN | J2751 | Solar | 125.0 MW | operational | Bolivar, Mississippi |
| Shelby SS - Roundaway SS (CE) 115 kV Line | J2768 | Solar | 120.0 MW | withdrawn | Bolivar, Mississippi |
| SHELBY SS | J3092 | Solar | 115.0 MW | withdrawn | Bolivar, Mississippi |
| Rosedale to Stringtown 115kV | J2736 | Solar | 100.0 MW | withdrawn | Bolivar, Mississippi |
| Rosedale - Delta 115 kV | J3186 | Solar | 100.0 MW | operational | Bolivar, Mississippi |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.