Demeter Storage 2 (26INR0523)

Demeter Storage 2 is a 138.0 MW other interconnection project in Caldwell, Texas with a current status of operational. It is proposed to connect at Tap 138kV 7224 LULING - 7216 Lockhart.

138.0 MWCapacity
OperationalStatus
CaldwellMarket
OtherTechnology

Project facts

Canonical nameDemeter Storage 2
Queue ID26INR0523
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketCaldwell
TechnologyOther
Capacity138.0 MW
StateTexas
CountyCaldwell
Point of interconnectionTap 138kV 7224 LULING - 7216 Lockhart
Requested (queue) date2024-10-01
Proposed in-service date
Operational date2029-06-01
Withdrawn date
DeveloperDemeter Solar, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata