Demeter Storage (25INR0130)

Demeter Storage is a 65.0 MW other interconnection project in Caldwell, Texas with a current status of operational. It is proposed to connect at Tap 138kV 7224 LULING - 7216 Lockhart.

65.0 MWCapacity
OperationalStatus
CaldwellMarket
OtherTechnology

Project facts

Canonical nameDemeter Storage
Queue ID25INR0130
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketCaldwell
TechnologyOther
Capacity65.0 MW
StateTexas
CountyCaldwell
Point of interconnectionTap 138kV 7224 LULING - 7216 Lockhart
Requested (queue) date2022-08-05
Proposed in-service date
Operational date2029-06-01
Withdrawn date
DeveloperDemeter Solar, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata