Denison 230kV Substation (GEN-2017-222)

Denison 230kV Substation is a 180.0 MW wind interconnection project in Denison, Iowa with a current status of active. It is proposed to connect at Denison 230kV Substation.

180.0 MWCapacity
ActiveStatus
IAMarket
WindTechnology

Project facts

Canonical nameDenison 230kV Substation
Queue IDGEN-2017-222
Statusactive
Source statusIA FULLY EXECUTED/ON SCHEDULE
MarketIA
TechnologyWind
Capacity180.0 MW
StateIowa
CountyDenison
Point of interconnectionDenison 230kV Substation
Requested (queue) date2017-11-30
Proposed in-service date2027-10-15
Operational date
Withdrawn date
Developer
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata