Deridder - Centennial 138-kV (J2169)

Deridder - Centennial 138-kV is a 98.9 MW solar interconnection project in Beauregard, Louisiana with a current status of withdrawn. It is proposed to connect at Deridder - Centennial 138-kV.

98.9 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameDeridder - Centennial 138-kV
Queue IDJ2169
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity98.9 MW
StateLouisiana
CountyBeauregard
Point of interconnectionDeridder - Centennial 138-kV
Requested (queue) date2021-08-17
Proposed in-service date2023-10-31
Operational date2023-10-31
Withdrawn date2025-03-07
Developer
Utility / transmission ownerCleco Power LLC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata