Desert Hill Solar (27INR0074)

Desert Hill Solar is a 250.5 MW solar interconnection project in Culberson, Texas with a current status of operational. It is proposed to connect at Tap 138kV El Capitan (#10179) - Black River (#1096)..

250.5 MWCapacity
OperationalStatus
CulbersonMarket
SolarTechnology

Project facts

Canonical nameDesert Hill Solar
Queue ID27INR0074
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketCulberson
TechnologySolar
Capacity250.5 MW
StateTexas
CountyCulberson
Point of interconnectionTap 138kV El Capitan (#10179) - Black River (#1096).
Requested (queue) date2024-01-11
Proposed in-service date
Operational date2030-07-01
Withdrawn date
DeveloperNextera
Utility / transmission ownerERCOT

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata