Desoto-Tanners Creek 345kV (V4-033)

Desoto-Tanners Creek 345kV is a 299.2 MW wind interconnection project in Randolph, Indiana with a current status of withdrawn.

299.2 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameDesoto-Tanners Creek 345kV
Queue IDV4-033
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity299.2 MW
StateIndiana
CountyRandolph
Point of interconnection
Requested (queue) date2009-12-11
Proposed in-service date2018-12-31
Operational date
Withdrawn date2016-09-08
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.