DIABLO CANYON P.P. UNIT 1 (98)

DIABLO CANYON P.P. UNIT 1 is a 37.0 MW gas interconnection project in San Luis Obispo, California with a current status of operational. It is proposed to connect at Diablo Canyon Substation Cirvuit Breakers 532 and 632.

37.0 MWCapacity
OperationalStatus
Market
GasTechnology

Project facts

Canonical nameDIABLO CANYON P.P. UNIT 1
Queue ID98
Statusoperational
Source statusCOMPLETED
Market
TechnologyGas
Capacity37.0 MW
StateCalifornia
CountySan Luis Obispo
Point of interconnectionDiablo Canyon Substation Cirvuit Breakers 532 and 632
Requested (queue) date2006-03-09
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata