Diamond Sage Solar 1 (27INR0390)

Diamond Sage Solar 1 is a 214.0 MW solar interconnection project in Webb, Texas with a current status of operational. It is proposed to connect at tap 345kV 80219 LOBO7A - 5709 FOWLER TONSW5 CKT2.

214.0 MWCapacity
OperationalStatus
WebbMarket
SolarTechnology

Project facts

Canonical nameDiamond Sage Solar 1
Queue ID27INR0390
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketWebb
TechnologySolar
Capacity214.0 MW
StateTexas
CountyWebb
Point of interconnectiontap 345kV 80219 LOBO7A - 5709 FOWLER TONSW5 CKT2
Requested (queue) date2025-01-28
Proposed in-service date
Operational date2028-10-01
Withdrawn date
DeveloperDGC Renewables, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata