Diamond Sage Solar 2 (27INR0395)

Diamond Sage Solar 2 is a 214.0 MW solar interconnection project in Webb, Texas with a current status of operational. It is proposed to connect at Tap 345kV LOBO7A (80219) - FOWLERTONSW5 (5709).

214.0 MWCapacity
OperationalStatus
WebbMarket
SolarTechnology

Project facts

Canonical nameDiamond Sage Solar 2
Queue ID27INR0395
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketWebb
TechnologySolar
Capacity214.0 MW
StateTexas
CountyWebb
Point of interconnectionTap 345kV LOBO7A (80219) - FOWLERTONSW5 (5709)
Requested (queue) date2025-01-28
Proposed in-service date
Operational date2028-10-01
Withdrawn date
DeveloperDGC Renewables, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata