Dilworth 69 kV (AG2-251)

Dilworth 69 kV is a 29.0 MW solar interconnection project in Trumbull, Ohio with a current status of withdrawn.

29.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameDilworth 69 kV
Queue IDAG2-251
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity29.0 MW
StateOhio
CountyTrumbull
Point of interconnection
Requested (queue) date2021-03-18
Proposed in-service date2023-01-15
Operational date
Withdrawn date2024-12-18
Developer
Utility / transmission ownerATSI

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata