Distribution line feeding Hurlwood substation (ASGI-2019-003)

Distribution line feeding Hurlwood substation is a 3.0 MW wind interconnection project in Lubbock, Texas with a current status of withdrawn. It is proposed to connect at Distribution line feeding Hurlwood substation.

3.0 MWCapacity
WithdrawnStatus
TXMarket
WindTechnology

Project facts

Canonical nameDistribution line feeding Hurlwood substation
Queue IDASGI-2019-003
Statuswithdrawn
Source statusWITHDRAWN
MarketTX
TechnologyWind
Capacity3.0 MW
StateTexas
CountyLubbock
Point of interconnectionDistribution line feeding Hurlwood substation
Requested (queue) date2019-04-23
Proposed in-service date
Operational date
Withdrawn date2020-10-22
Developer
Utility / transmission ownerSPS

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata