DIXIE MEADOWS #2 (397)

DIXIE MEADOWS #2 is a 52.5 MW gas interconnection project in Churchill, Nevada with a current status of withdrawn. It is proposed to connect at Bishop Substation.

52.5 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameDIXIE MEADOWS #2
Queue ID397
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyGas
Capacity52.5 MW
StateNevada
CountyChurchill
Point of interconnectionBishop Substation
Requested (queue) date2008-05-29
Proposed in-service date
Operational date
Withdrawn date2008-11-26
Developer
Utility / transmission ownerSCE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata