SCE — Interconnection Queue Projects
SCE is associated with 10,889 tracked interconnection projects representing 252,467 MW of requested capacity.
Entity resolution: single source organization name; no cluster merge applied.
10,889Projects
135Active
10,081Operational
673Withdrawn
252,467 MWRequested capacity
1Markets
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Gas | 185 | 63,243 MW |
| Battery | 188 | 63,002 MW |
| Solar+Battery | 163 | 48,701 MW |
| Solar | 10,136 | 47,051 MW |
| Wind | 199 | 22,660 MW |
| Other | 10 | 4,349 MW |
| Gas+Battery | 4 | 1,656 MW |
| Other Storage | 2 | 1,035 MW |
| Solar+Wind+Battery | 1 | 405 MW |
| Geothermal | 1 | 364 MW |
Portfolio by market
| Market | Projects |
|---|---|
| CAISO | 85 |
Geographic footprint
| State | Projects |
|---|---|
| California | 10,811 |
| Nevada | 60 |
| Arizona | 15 |
| New Mexico | 1 |
| Wyoming | 1 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| PATHFINDER RENEWABLE WIND ENERGY | 741 | Wind | 3,000.0 MW | withdrawn | Platte, Wyoming |
| ALAMITOS ENERGY CENTER | 939 | Gas | 1,902.9 MW | withdrawn | Los Angeles, California |
| COWBOY MESA WIND | 689 | Wind | 1,700.0 MW | withdrawn | Lincoln, New Mexico |
| EMPIRE | 2030 | Battery | 1,600.0 MW | withdrawn | San Bernadino, California |
| SEARCHLIGHT 1 | 126 | Wind | 1,500.0 MW | withdrawn | Clark, Nevada |
| EAGLE MOUNTAIN PUMP STORAGE #4 | 1193 | Battery | 1,408.0 MW | withdrawn | Riverside, California |
| SANBORN HYBRID 3 | 1632 | Solar+Battery | 1,400.0 MW | active | Kern, California |
| ETERNAL 2 | 2050 | Battery | 1,400.0 MW | withdrawn | Riverside, California |
| EAGLE MOUNTAIN PUMP STORAGE #3 | 697 | Other | 1,400.0 MW | withdrawn | Riverside, California |
| EAGLE MOUNTAIN PUMP STORAGE #2 | 567 | Other | 1,400.0 MW | withdrawn | Riverside, California |
| IRON HILLS PUMPED STORAGE | 1525 | Battery | 1,400.0 MW | withdrawn | Riverside, California |
| ETERNAL PUMPED STORAGE | 1759 | Battery | 1,400.0 MW | withdrawn | Riverside, California |
| SES SOLAR SIX | 110 | Solar | 1,400.0 MW | withdrawn | San Bernardino, California |
| EAGLE MOUNTAIN PUMPED STORAGE PROJECT | 369 | Other | 1,300.0 MW | withdrawn | Riverside, California |
| SES SOLAR SEVEN | 120 | Solar | 1,200.0 MW | withdrawn | San Bernardino, California |
| Boson | 2289 | Solar+Battery | 1,173.5 MW | withdrawn | Kern, California |
| ALTA 12 | 450 | Wind | 1,150.0 MW | withdrawn | Los Angeles/kern, California |
| ALTA 13 | 451 | Gas | 1,150.0 MW | withdrawn | San Bernardino, California |
| ANGELENO SOLAR FARM | 1625 | Solar+Battery | 1,150.0 MW | active | Los Angeles, California |
| CITY OF VERNON RENEWABLE PROJECT 2 | 505 | Solar | 1,100.0 MW | withdrawn | Kern, California |
| Hillside Energy Storage | 2327 | Battery | 1,064.7 MW | active | Los Angeles, California |
| RIO HONDO POWER | 991 | Gas | 1,047.0 MW | withdrawn | Los Angeles, California |
| Crusade | 2350 | Battery | 1,029.0 MW | active | Orange, California |
| Lagoonez | 2294 | Battery | 1,029.0 MW | active | Los Angeles, California |
| DESERT OPAL III PV | 229 | Solar | 1,000.0 MW | withdrawn | San Bernardino, California |
| BOUSE SOLAR AND STORAGE PLANT | 2052 | Solar+Battery | 1,000.0 MW | active | La Paz, Arizona |
| WILDCAT QUARTSZITE | 643AL | Gas | 1,000.0 MW | withdrawn | Yuma, Arizona |
| DESERT RUBY PV | 230 | Solar | 1,000.0 MW | withdrawn | San Bernardino, California |
| COYOTE SPRINGS | 500 | Gas | 960.0 MW | withdrawn | Lincoln, Nevada |
| HUNTINGTON BEACH | 893 | Gas | 938.6 MW | withdrawn | Orange, California |
| VIEJO HYBRID POWER | 1088 | Gas | 910.0 MW | withdrawn | Riverside, California |
| CENTER POWER | 990 | Gas | 910.0 MW | withdrawn | Los Angeles, California |
| MIRA LOMA HYBRID POWER PROJECT | 1085 | Gas | 910.0 MW | withdrawn | San Bernardino, California |
| RANEGRAS EAGLETAIL | 388 | Gas | 900.0 MW | withdrawn | La Paz/maricopa, Arizona |
| LA POSA | 387 | Gas | 900.0 MW | withdrawn | La Paz, Arizona |
| AZ BIGHORN | 389 | Gas | 900.0 MW | withdrawn | Maricopa, Arizona |
| CADIZ WEST | 384 | Gas | 900.0 MW | withdrawn | San Bernardino, California |
| PORTHOS SOLAR | 1523 | Solar+Battery | 900.0 MW | withdrawn | Riverside, California |
| K ROAD CALICO SOLAR LLC (KRCS) (FKA CALICO SOLAR 1; SES SOLAR ONE) | 68 | Solar | 850.0 MW | withdrawn | San Bernardino, California |
| CPV SENTINEL (FKA INTERGEN OCOTILLO) | 3 | Gas | 850.0 MW | operational | Riverside, California |
| CLEARWATER SOLAR GENERATING STATION | 456 | Gas | 840.0 MW | withdrawn | Los Angeles, California |
| INLAND EMPIRE ENERGY CENTER | 50 | Gas | 810.0 MW | operational | Riverside, California |
| VENTURA CLEAN ENERGY | 977 | Gas | 778.0 MW | withdrawn | Ventura, California |
| TRILOBITE SOLAR PROJECT | 290 | Gas | 750.0 MW | withdrawn | San Bernardino, California |
| PALO VERDE MESA (FKA BRIGHTSOURCE MIDPOINT SOLAR) | 643AC | Gas | 750.0 MW | withdrawn | Riverside, California |
| CENTRAL COAST WIND 1 | 1781 | Wind | 750.0 MW | withdrawn | Santa Barbara, California |
| BPAE KERN FRONT | 195 | Gas | 725.0 MW | withdrawn | Kern, California |
| Icarus Solar | 2310 | Solar+Battery | 718.2 MW | withdrawn | Mohave, Arizona |
| Icarus Wind and Solar | 54616 | Solar+Battery | 717.8 MW | withdrawn | California |
| Sunflower | 2240 | Solar+Battery | 715.1 MW | active | San Bernardino, California |
| CVH POWER II | 808 | Solar | 700.0 MW | withdrawn | Maricopa, Arizona |
| DESERT QUARTZSITE PV | 270 | Solar | 700.0 MW | withdrawn | Riverside, California |
| PV-47 | 363 | Solar | 700.0 MW | withdrawn | Kern, California |
| CALIFORNIA CITY SOLAR | 1320 | Solar | 700.0 MW | withdrawn | Kern, California |
| ARIDA 2 SOLAR FARM | 1647 | Solar+Battery | 700.0 MW | active | Clark, Nevada |
| PV-48 | 364 | Solar | 700.0 MW | withdrawn | Kern, California |
| PV-49 | 400 | Solar | 700.0 MW | withdrawn | Kern, California |
| SANTA ANA ENERGY CENTER | 1087 | Gas | 700.0 MW | withdrawn | Orange, California |
| BLYTHE III | 167 | Gas | 700.0 MW | withdrawn | Riverside, California |
| ETIWANDA CCGT | 139 | Gas | 698.0 MW | withdrawn | San Bernardino, California |
| CITY OF VERNON RENEWABLE PROJECT 1 | 504 | Wind | 688.0 MW | withdrawn | Kern, California |
| MENIFEE POWER BANK | 1645 | Battery | 680.0 MW | operational | Riverside, California |
| MESAVILLE SOLAR | 1406 | Solar+Battery | 675.0 MW | withdrawn | Riverside, California |
| EDISON DRIVE ENERGY STORAGE | 2087 | Battery | 660.0 MW | withdrawn | Ventura, California |
| ANTELOPE SOLAR 2 | 1208 | Solar+Battery | 650.0 MW | active | Los Angeles, California |
| ALTA Q175 (FKA ALTA 11) | 175 | Wind | 650.0 MW | withdrawn | Kern, California |
| EASLEY | 2042 | Solar+Battery | 650.0 MW | active | Riverside, California |
| BLYTHE III (REVISED) | 225 | Gas | 640.0 MW | withdrawn | Riverside, California |
| MOJAVE SOLAR PARK 1 | 106 | Gas | 635.0 MW | withdrawn | San Bernardino, California |
| COPPER MOUNTAIN II | 237 | Gas | 634.0 MW | withdrawn | Clark, Nevada |
| COPPER MOUNTAIN II ALTERNATE | 263 | Gas | 634.0 MW | withdrawn | Clark, Nevada |
| COPPER MOUNTAIN PROJECT | 56 | Gas | 634.0 MW | withdrawn | Clark, Nevada |
| GRAND AVE GENERATION FACILITY (FKA GRAND AVE SIMPLE CYCLE) | 1083 | Gas | 625.4 MW | withdrawn | Orange, California |
| BIRCH STREET GENERATION FACILITY (FKA BIRCH STREET- SIMPLE CYCLE) | 1080 | Gas | 625.4 MW | withdrawn | Orange, California |
| Date Palm | 2315 | Battery | 620.6 MW | withdrawn | San Bernardino, California |
| Sunvine | 2319 | Solar+Battery | 613.7 MW | active | Kern, California |
| CARSON HYDROGEN POWER PROJECT (CHPP) | 88 | Gas | 613.5 MW | withdrawn | Los Angeles, California |
| MOJAVE SOLAR PARK 4 - JOHNSON VALLEY | 376 | Gas | 612.0 MW | withdrawn | San Bernardino, California |
| VERNON POWER PLANT | 80 | Gas | 610.0 MW | withdrawn | Los Angeles, California |
| CPC WEST | 96 | Wind | 600.0 MW | active | Kern, California |
Recent material changes
| Observed | Project | Field | Old | New |
|---|---|---|---|---|
| 2026-08-18 | MENIFEE POWER BANK | status | active | operational |
| 2026-08-14 | GREENWOOD ENERGY STORAGE | withdrawn_date | — | 2026-08-12 |
| 2026-08-14 | GREENWOOD ENERGY STORAGE | status | active | withdrawn |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: ca-dgstats; California ISO — public interconnection queue; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Track queue activity connecting through SCE.
Start tracking with interXdata