SCE — Interconnection Queue Projects

SCE is associated with 10,889 tracked interconnection projects representing 252,467 MW of requested capacity.

Entity resolution: single source organization name; no cluster merge applied.

10,889Projects
135Active
10,081Operational
673Withdrawn
252,467 MWRequested capacity
1Markets

Capacity by technology

TechnologyProjectsRequested capacity
Gas18563,243 MW
Battery18863,002 MW
Solar+Battery16348,701 MW
Solar10,13647,051 MW
Wind19922,660 MW
Other104,349 MW
Gas+Battery41,656 MW
Other Storage21,035 MW
Solar+Wind+Battery1405 MW
Geothermal1364 MW

Portfolio by market

MarketProjects
CAISO85

Geographic footprint

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
PATHFINDER RENEWABLE WIND ENERGY741Wind3,000.0 MWwithdrawnPlatte, Wyoming
ALAMITOS ENERGY CENTER939Gas1,902.9 MWwithdrawnLos Angeles, California
COWBOY MESA WIND689Wind1,700.0 MWwithdrawnLincoln, New Mexico
EMPIRE2030Battery1,600.0 MWwithdrawnSan Bernadino, California
SEARCHLIGHT 1126Wind1,500.0 MWwithdrawnClark, Nevada
EAGLE MOUNTAIN PUMP STORAGE #41193Battery1,408.0 MWwithdrawnRiverside, California
SANBORN HYBRID 31632Solar+Battery1,400.0 MWactiveKern, California
ETERNAL 22050Battery1,400.0 MWwithdrawnRiverside, California
EAGLE MOUNTAIN PUMP STORAGE #3697Other1,400.0 MWwithdrawnRiverside, California
EAGLE MOUNTAIN PUMP STORAGE #2567Other1,400.0 MWwithdrawnRiverside, California
IRON HILLS PUMPED STORAGE1525Battery1,400.0 MWwithdrawnRiverside, California
ETERNAL PUMPED STORAGE1759Battery1,400.0 MWwithdrawnRiverside, California
SES SOLAR SIX110Solar1,400.0 MWwithdrawnSan Bernardino, California
EAGLE MOUNTAIN PUMPED STORAGE PROJECT369Other1,300.0 MWwithdrawnRiverside, California
SES SOLAR SEVEN120Solar1,200.0 MWwithdrawnSan Bernardino, California
Boson2289Solar+Battery1,173.5 MWwithdrawnKern, California
ALTA 12450Wind1,150.0 MWwithdrawnLos Angeles/kern, California
ALTA 13451Gas1,150.0 MWwithdrawnSan Bernardino, California
ANGELENO SOLAR FARM1625Solar+Battery1,150.0 MWactiveLos Angeles, California
CITY OF VERNON RENEWABLE PROJECT 2505Solar1,100.0 MWwithdrawnKern, California
Hillside Energy Storage2327Battery1,064.7 MWactiveLos Angeles, California
RIO HONDO POWER991Gas1,047.0 MWwithdrawnLos Angeles, California
Crusade2350Battery1,029.0 MWactiveOrange, California
Lagoonez2294Battery1,029.0 MWactiveLos Angeles, California
DESERT OPAL III PV229Solar1,000.0 MWwithdrawnSan Bernardino, California
BOUSE SOLAR AND STORAGE PLANT2052Solar+Battery1,000.0 MWactiveLa Paz, Arizona
WILDCAT QUARTSZITE643ALGas1,000.0 MWwithdrawnYuma, Arizona
DESERT RUBY PV230Solar1,000.0 MWwithdrawnSan Bernardino, California
COYOTE SPRINGS500Gas960.0 MWwithdrawnLincoln, Nevada
HUNTINGTON BEACH893Gas938.6 MWwithdrawnOrange, California
VIEJO HYBRID POWER1088Gas910.0 MWwithdrawnRiverside, California
CENTER POWER990Gas910.0 MWwithdrawnLos Angeles, California
MIRA LOMA HYBRID POWER PROJECT1085Gas910.0 MWwithdrawnSan Bernardino, California
RANEGRAS EAGLETAIL388Gas900.0 MWwithdrawnLa Paz/maricopa, Arizona
LA POSA387Gas900.0 MWwithdrawnLa Paz, Arizona
AZ BIGHORN389Gas900.0 MWwithdrawnMaricopa, Arizona
CADIZ WEST384Gas900.0 MWwithdrawnSan Bernardino, California
PORTHOS SOLAR1523Solar+Battery900.0 MWwithdrawnRiverside, California
K ROAD CALICO SOLAR LLC (KRCS) (FKA CALICO SOLAR 1; SES SOLAR ONE)68Solar850.0 MWwithdrawnSan Bernardino, California
CPV SENTINEL (FKA INTERGEN OCOTILLO)3Gas850.0 MWoperationalRiverside, California
CLEARWATER SOLAR GENERATING STATION456Gas840.0 MWwithdrawnLos Angeles, California
INLAND EMPIRE ENERGY CENTER50Gas810.0 MWoperationalRiverside, California
VENTURA CLEAN ENERGY977Gas778.0 MWwithdrawnVentura, California
TRILOBITE SOLAR PROJECT290Gas750.0 MWwithdrawnSan Bernardino, California
PALO VERDE MESA (FKA BRIGHTSOURCE MIDPOINT SOLAR)643ACGas750.0 MWwithdrawnRiverside, California
CENTRAL COAST WIND 11781Wind750.0 MWwithdrawnSanta Barbara, California
BPAE KERN FRONT195Gas725.0 MWwithdrawnKern, California
Icarus Solar2310Solar+Battery718.2 MWwithdrawnMohave, Arizona
Icarus Wind and Solar54616Solar+Battery717.8 MWwithdrawnCalifornia
Sunflower2240Solar+Battery715.1 MWactiveSan Bernardino, California
CVH POWER II808Solar700.0 MWwithdrawnMaricopa, Arizona
DESERT QUARTZSITE PV270Solar700.0 MWwithdrawnRiverside, California
PV-47363Solar700.0 MWwithdrawnKern, California
CALIFORNIA CITY SOLAR1320Solar700.0 MWwithdrawnKern, California
ARIDA 2 SOLAR FARM1647Solar+Battery700.0 MWactiveClark, Nevada
PV-48364Solar700.0 MWwithdrawnKern, California
PV-49400Solar700.0 MWwithdrawnKern, California
SANTA ANA ENERGY CENTER1087Gas700.0 MWwithdrawnOrange, California
BLYTHE III167Gas700.0 MWwithdrawnRiverside, California
ETIWANDA CCGT139Gas698.0 MWwithdrawnSan Bernardino, California
CITY OF VERNON RENEWABLE PROJECT 1504Wind688.0 MWwithdrawnKern, California
MENIFEE POWER BANK1645Battery680.0 MWoperationalRiverside, California
MESAVILLE SOLAR1406Solar+Battery675.0 MWwithdrawnRiverside, California
EDISON DRIVE ENERGY STORAGE2087Battery660.0 MWwithdrawnVentura, California
ANTELOPE SOLAR 21208Solar+Battery650.0 MWactiveLos Angeles, California
ALTA Q175 (FKA ALTA 11)175Wind650.0 MWwithdrawnKern, California
EASLEY2042Solar+Battery650.0 MWactiveRiverside, California
BLYTHE III (REVISED)225Gas640.0 MWwithdrawnRiverside, California
MOJAVE SOLAR PARK 1106Gas635.0 MWwithdrawnSan Bernardino, California
COPPER MOUNTAIN II237Gas634.0 MWwithdrawnClark, Nevada
COPPER MOUNTAIN II ALTERNATE263Gas634.0 MWwithdrawnClark, Nevada
COPPER MOUNTAIN PROJECT56Gas634.0 MWwithdrawnClark, Nevada
GRAND AVE GENERATION FACILITY (FKA GRAND AVE SIMPLE CYCLE)1083Gas625.4 MWwithdrawnOrange, California
BIRCH STREET GENERATION FACILITY (FKA BIRCH STREET- SIMPLE CYCLE)1080Gas625.4 MWwithdrawnOrange, California
Date Palm2315Battery620.6 MWwithdrawnSan Bernardino, California
Sunvine2319Solar+Battery613.7 MWactiveKern, California
CARSON HYDROGEN POWER PROJECT (CHPP)88Gas613.5 MWwithdrawnLos Angeles, California
MOJAVE SOLAR PARK 4 - JOHNSON VALLEY376Gas612.0 MWwithdrawnSan Bernardino, California
VERNON POWER PLANT80Gas610.0 MWwithdrawnLos Angeles, California
CPC WEST96Wind600.0 MWactiveKern, California

Recent material changes

ObservedProjectFieldOldNew
2026-08-18MENIFEE POWER BANKstatusactiveoperational
2026-08-14GREENWOOD ENERGY STORAGEwithdrawn_date2026-08-12
2026-08-14GREENWOOD ENERGY STORAGEstatusactivewithdrawn

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: ca-dgstats; California ISO — public interconnection queue; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Track queue activity connecting through SCE.

Start tracking with interXdata