Dock Battery Energy Storage 2 (0836)

Dock Battery Energy Storage 2 is a 56.3 MW battery interconnection project in Queens, New York with a current status of withdrawn. It is proposed to connect at Astoria East Substation 138kV.

56.3 MWCapacity
WithdrawnStatus
JMarket
BatteryTechnology

Project facts

Canonical nameDock Battery Energy Storage 2
Queue ID0836
Statuswithdrawn
Source status0
MarketJ
TechnologyBattery
Capacity56.3 MW
StateNew York
CountyQueens
Point of interconnectionAstoria East Substation 138kV
Requested (queue) date2019-05-07
Proposed in-service date2020-02-29
Operational date
Withdrawn date
DeveloperAstoria Generating Company, L.P.
Utility / transmission ownerCONED

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata