Dolet Hills (J3178)

Dolet Hills is a 50.0 MW battery interconnection project in De Soto, Louisiana with a current status of withdrawn. It is proposed to connect at Dolet Hills.

50.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameDolet Hills
Queue IDJ3178
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity50.0 MW
StateLouisiana
CountyDe Soto
Point of interconnectionDolet Hills
Requested (queue) date2022-09-15
Proposed in-service date2026-10-01
Operational date2026-10-01
Withdrawn date2023-03-24
Developer
Utility / transmission ownerCleco Power LLC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata